Where the failure sits decides more than the method does
People often arrive with a method already in mind, usually lining, because a neighbor had it done or they read that it avoids digging. The more useful question comes first: where along the lateral is the pipe failing, and what shape is it in? A camera recording from the cleanout to the main answers both, and everything below depends on it. A lateral cracked along its length but still round is a different candidate from one that has caved in near the curb, and both differ from a line that dips and holds water. If you have not had the line filmed yet, start with a sewer camera inspection.
Lining, bursting or a shovel: a decision guide
Work through these in order. The first answer that rules something out usually settles the question.
- Can a camera pass the whole run? If a section has collapsed so completely that nothing gets through, lining is off the table there. Bursting may still work, because the bursting head breaks its own way through the old pipe.
- Does the pipe hold its grade? A belly, where the line dips and water stands, survives both methods. A liner follows the old pipe’s profile and a burst pipe follows its path, so a true sag means excavating that section.
- Does the diameter need to grow? A liner slightly reduces the inside diameter. If the existing lateral is already too small for the house, bursting can pull a larger HDPE pipe through the same path.
- How many branches join along the way? After curing, each branch connection inside a lined pipe has to be reopened with a reinstatement cutter. A few is routine; many add work and more points to seal.
- Where would the pits go? Lining can often go in through an existing cleanout. Bursting needs a pit at each end. If a pit lands in the street or near a tree, the Tulare rules in the next two sections apply to it.
If question 2 rules your line out, or questions 1 and 3 both point the wrong way, an open trench is the honest answer for at least part of the run, and our page on conventional lateral repair is the better guide. Lining also needs a clean wall to bond to, so roots are cut out first; if yours keep returning in the meantime, a rooter visit buys time while the job is planned.
Opening a Tulare street, item by item
When the failure is out under the asphalt, the City’s encroachment requirements set the pace of a conventional repair. Engineering’s application form includes a checkbox for sewer laterals and wants the hole’s depth, width and length spelled out. The permit only becomes valid once an Underground Service Alert ticket number is on file. A traffic control plan is mandatory for street and alley work, prepared by someone with the right qualifications: a registered civil engineer, a traffic engineer or a traffic control specialist. The contractor needs a City of Tulare business license and must file insurance certificates. Digging is normally limited to weekdays within the City’s business hours, and under Chapter 8.12 a trench may not cross more than half of a traveled street at one time.
Those items apply to any opening in the street, whether it is a trench running the width of a lane or a single small pit. That is the real case for trenchless work here. It rarely removes the City from the process entirely, but it can turn a long cut across sidewalk, gutter and lane into one compact pit, or into no street work at all when the liner goes in from your side.
Working around a parkway tree
Tulare’s street tree chapter draws a four-foot circle around every street tree: no ditch, tunnel or trench goes inside it without permission in writing from the Director. Plenty of laterals pass closer than that, because the lateral has to cross the parkway strip between the sidewalk and the curb to reach the main, and that strip is where the street tree grows. A trench there means asking permission first and then cutting through roots that hold the tree up.
A liner inserted from the cleanout passes under the tree without disturbing the soil. Bursting can too, if both pits fall outside the four-foot circle, though we confirm with the City how it views bursting that close to a street tree before relying on it. Where a pit cannot avoid the circle, we seek the Director’s permission before scheduling anything. Keep in mind that the code also makes the property owner answer for harm a parkway tree causes to their own lateral, so a joint-free pipe is a practical answer to the next round of roots, not just this one. If the tree is ever replaced, the same chapter requires root barriers with new street tree plantings in residential parkways.
Trenchless is still permitted, inspected sewer work
Skipping the trench does not skip the City. Tulare’s sewer permit rule covers replacing sewage facilities, and a cured liner or a burst-in pipe is exactly that. The City still looks at the new pipe, and the inspection has to be requested at least 24 hours in advance, counting only weekdays that are not holidays. Any part of the job beyond the property line, under sidewalk or street, is reserved for licensed contractors. Because the finished pipe is mostly out of sight, we film it from end to end after installation, so you and the inspector can see the new line, its reopened branches and its connection at the main.