Day one: the camera decides what kind of repair this is
Before anyone talks about digging, the line has to be seen. A camera goes in through the cleanout and records the whole run to the connection, and a locator marks the failure on the surface. Three answers come out of that first visit: what failed (a crack, a crushed section, a separated joint, a sag that holds water), how deep it lies, and where it sits. The last of those shapes the schedule most. A break in the back yard and a break beneath the sidewalk or the street are different projects in Tulare, as the steps below show. The recording is yours to keep, and it is the same evidence the repair is priced from.
Two outcomes end the project right there. If your line is only blocked, not broken, you need it cleared rather than repaired, and a rooter visit to cut the obstruction is the whole job. If the defect turns out to be in the public main rather than your lateral, we stop and point you to the City, because that pipe is theirs. For a fuller look at how the footage is read, see our page on filming a Tulare sewer lateral.
Before digging: the permit and who may hold it
Tulare’s sewer chapter requires a permit before sewage facilities are installed, extended, altered, relocated or replaced, and a lateral repair falls squarely in that list. Starting without one adds a penalty. The exception is work the General Manager accepts as an emergency, and even then the permit is taken out as soon as practical.
The code also limits who can hold that permit. It goes to someone with a valid business license, or to an owner who lives in the single-family house and does every bit of the work in person. A landlord fixing a rental does not fit the owner route, and neither does an owner who hires a friend with a backhoe. On jobs we take on, we handle the permit application and every inspection request, so you are not left chasing paperwork with a trench in the yard.
The calendar changes once the break reaches public ground
Your responsibility does not stop at the property line. In Tulare’s code, the building sewer is everything between the house drain and the City’s sewer, and keeping it in repair falls to the owner of the lot it drains. A crack under the sidewalk is still your repair, even though it sits beneath public ground.
What changes is who may do the work and how long it takes to begin. The right-of-way is off limits to anyone but a licensed contractor. Opening a street or alley brings in City Engineering, and its schedule stacks on top of the sewer permit: two working days’ warning before the first shovel, another heads-up after any interruption, weekday work during City business hours, and 48 hours’ notice for Engineering’s own inspections. None of that is unreasonable, but it explains why a repair at the curb tends to start later than one by the back fence, and why we look hard at whether lining or bursting the old pipe in place could leave the pavement alone.
The open trench waits for the inspector
Once the old section is out and new pipe is bedded on the right slope, nothing gets buried until the City has seen it. All new sewer piping and fittings are inspected, and the request has to be in a full 24 hours beforehand, with weekend days and holidays not counting toward the wait.
We plan around that rather than against it. Where we can, digging and pipe work are sequenced so the inspection request goes in early in the week, and an open excavation is always covered and barricaded while it waits. A repair that skips this step is not a shortcut. Pipe buried before inspection may have to be uncovered again, on a worse day and with more disruption.
What the finished lateral has to include
A repair is the moment to bring the lateral up to what Tulare’s code expects, and a few requirements come up again and again:
- Where the building sewer crosses the public right-of-way, it must be at least as large as the house drain, and four inches at minimum.
- If the work changes the house sewer’s direction, a cleanout to grade goes in at the change.
- If any drain in the house is lower than the top of the closest upstream manhole or cleanout on the public line, an approved backwater valve goes on the building sewer.
- Where a building drain sits too deep to empty into the public sewer by gravity, the waste must be pumped up by an approved method, which is where an ejector pump system comes in.
- Roof, rain and storm water may not be tied into any sewer. City code treats every such tie-in as a separate misdemeanor, so an open trench is not the moment to add a downspout. Storm water belongs in a storm drain or an approved natural outlet.
Materials and methods follow the City’s standard specifications and the California Plumbing Code, and where the two differ, the City’s standards govern.