The letter, the due date and what happens after it
The notice tends to arrive when something else needs attention. Tulare requires any business or residential property with a backflow assembly to have it tested once a year, under the City’s Cross Connection Control Program and the State’s rules, and the City’s wording about late tests is short: devices not tested and submitted by their due date “may be subject to disconnection.”
There is no second water company to fall back on. Inside city limits the City of Tulare is the only municipal water purveyor, and its Water Division runs both the meters and the testing program. If service is shut off, the Municipal Code (7.08.010) says nobody may turn a curb cock back on to admit water to a property without a permit from the Water Collector. So getting water flowing again runs through the City, on the City’s schedule. Booking the test a few weeks ahead of the due date is the simplest way to keep that from happening.
Who the Water Division takes results from
Certification is the first gate. Tulare accepts results only from testers currently certified by the American Backflow Prevention Association (ABPA) or by the California-Nevada Section of the American Water Works Association. The second gate is the paperwork behind the tester: certification and the calibration of the test gauge both have to be kept current with the Water Division. A tester who is not on the City’s list has to send those records in before a result is accepted.
The City posts a tester list updated for 2026 and says it is non-exclusive and not an endorsement. Whoever tests for you, us included, should be able to confirm that their certification and gauge calibration on file with the Water Division are current. Ask before test day. It takes a minute and saves a rejected form.
At the assembly on test day
A test briefly interrupts water to whatever the assembly protects. On a lawn line nobody notices. In a commercial kitchen it matters, so we agree on a window first. The tester shuts the downstream valve, connects a differential pressure gauge to the test cocks and works through the device in the order its type demands:
| Assembly |
What the test has to show |
| Reduced pressure principle (RP) |
Both checks hold, and the relief valve opens before the pressure difference across the first check falls too low |
| Double check valve (DC) |
Each check valve holds tight on its own against reversed pressure |
| Pressure vacuum breaker (PVB) |
The air inlet opens as pressure falls, and the check valve holds |
Each reading is written on the form at the device along with the make, model, size and serial number, so the result is tied to the exact assembly the City has on record. A typical lawn irrigation system carries a PVB or an RP, and a business may have several assemblies at once: the meter, a boiler feed, a soda line, a fire service. Each one gets its own form.
One snag comes up often enough to mention. If the shutoff valve on the downstream side will not close fully, the gauge cannot isolate the checks and the readings mean nothing. A seized or passing shutoff has to be replaced before an honest test is possible, and we say so on the spot rather than writing down numbers we do not trust.
The City is specific here: all test forms must be submitted in blue ink. They can go to the Water Division by email, drop-off or mail. We fill ours out in blue at the assembly, send it in, and hand you a copy. That copy is worth keeping in a folder with prior years, because a property manager, an insurer or a buyer reviewing a commercial lease may ask to see the testing history, and the person who can find it fastest is usually you.
When a device does not pass
A failed test is a repair order, not a fine. Typical culprits are debris on a check valve seat, a hardened rubber disc, a stiff relief valve diaphragm or a cracked bonnet on an exposed irrigation device. Most assemblies are rebuilt in place with the manufacturer’s parts. One that is cracked, obsolete or the wrong type for its hazard is replaced, which turns the visit into a preventer installation rather than a test.
The State Water Board’s Cross-Connection Control Policy Handbook, in effect since July 2024, calls for an assembly to be tested after a repair as well as every year. A rebuilt device therefore gets a second test and its own form before the City sees a pass.
Properties with a well get a test written into code
Some Tulare lots have City service and an old private well side by side. For those, the well ordinance (TMC 7.09.130) requires a City-approved reduced pressure principle device installed at the public water supply meter connection, inspected and tested at least once a year at the water user’s expense. That RP joins the same annual cycle as every other assembly in town. If your property has a well and no RP at the meter, there is nothing to test yet. The device has to be installed first, and the City’s approval of the model and location comes before anything is ordered.