A town that has barely built in a decade
The Census Bureau’s 2020-2024 estimates count 98 homes built in Exeter during the 2010s and an estimate of zero since 2020. The busy stretch before that was the early 2000s, and before that the 1970s through the 1990s. The median Exeter home was put up around the end of the 1970s.
That pause is set to end, at least on paper. In July 2026 the City Council adopted the 2023-2031 Housing Element, with a regional allocation of 844 new dwelling units. The plan does not dictate what form each of those homes takes. It could mean houses on vacant lots, multifamily buildings, or second units behind existing homes. Whatever the mix, a good deal of new pipe will go into the ground in a town that has not laid much of it lately.
For a builder or an owner, that means two things. Plan reviewers and inspectors are working under a brand-new code edition. And once projects start moving, the trades get busy, so locking in the plumbing schedule early protects the dates of every crew that follows.
The code edition your permit answers to
The 2025 California Building Standards Code, Title 24, took effect statewide on January 1, 2026. The California Plumbing Code is Part 5. Under Health and Safety Code 18938.5, the edition that governs a project is the one in force when the permit application is submitted, so anything applied for since New Year’s Day 2026 is reviewed under the 2025 code.
That catches projects drawn up earlier and shelved while financing came together. Before we price anything, we read the plumbing sheets against the edition you are actually under. Finding a mismatch at plan stage is a phone call to the designer. Finding it at top-out means cutting out work that is already built. We pull permits where the work requires them, and we tell you which inspections to expect before the first trench is dug.
Three inspections, three places a schedule slips
Underground. Before the slab is poured or the floor is framed, the building drain and any water lines below the floor go in at the correct slope and get tested. A drain test means plugging the openings, filling the system and watching that it holds. Nothing gets backfilled until it passes.
Top-out. Once the frame is up, drain, waste and vent piping runs through the walls and out the roof, supply lines reach every fixture location, and stub-outs come through exactly where cabinets and fixtures will sit. Steel plates go over any pipe that passes close to the face of a stud, so a drywall screw cannot find it later. If we are running the gas piping for the range, heater and dryer, it is tested at this stage too.
Final. After drywall and finishes come the fixtures, the valves and a properly strapped water heater with its relief line run to code. We check flow at every outlet and walk the owner through the shutoffs.
We schedule our visits around your concrete crew and framer, not the other way round. A failed test at any of these stages holds up every trade behind it, which is why we test our own work before the inspector arrives.
From the City main to your foundation
A new house needs a water service and a sewer connection, and on many lots that means digging in the public right-of-way. Exeter Municipal Code Chapter 12.04 sets the terms. A written permit is required before cutting any City street, alley or sidewalk, it has to be obtained at least 24 hours before the cut, and the excavation cannot stay open more than 48 hours unless the city engineer grants more time. Those permits go only to contractors licensed by the state for the work, or to public utilities. The City’s application form carries checkboxes for a sewer connection, a water main connection and backflow, which tells you what the City expects to review.
We plan the street work so materials, crew, inspection and backfill all fit inside that window. If the project calls for a backflow assembly on the new service, it goes into the same plan rather than becoming a second dig.
Once the house is connected, it joins a system where every service is metered. The City counted 3,311 connections in 2020, all of them on meters. A pinhole left behind in a supply line becomes the new owner’s leak and the new owner’s water, which is why we pressure-test the supply side before the walls close and again at final.
What we need to bid an Exeter project
- the plumbing sheets and fixture schedule
- a site plan showing where water and sewer connect
- water heater and appliance specs, including anything that burns gas
- your target dates for the foundation and for framing
- any changes from the approved plans
With those in hand we can give you a written bid by phase, so you know what is due at underground, top-out and final.
Start with a site walk
Every bid we write for new work starts on the dirt, not on a spreadsheet. All Flow Plumbing, Inc. holds CSLB contractor’s license 1072777, carries bonding and insurance, and has worked out of Exeter since the company opened in 2021. Call (559) 648-6871 with the address and your plans, and we will set a time to meet you on site.